<legend id="c6966"><strong id="c6966"></strong></legend>
<cite id="c6966"></cite>

    <b id="c6966"></b>
    
    

    New Products

    • 1
    • 2
    • 3
    • 4
    • 5
    • 1
    • 2
    • 3
    • 4
    • 5
    Home>News>Company News>Tress Floor, sealed smoothly

    Tress Floor, sealed smoothly

    Date: 2013/4/17      Source: Zhejiang Tress Electronic Technology Co.,Ltd.     Views: 5326

    April 15,2013, Hubei Tress Industrial Park-Science and technology building has been

    sealed smoothly as schedule.

    From the day we started the  Science and technology building project , due to all 

    the parties participated in the construction,the project has progressed smoothly , 

    therefor,e we have the sate production,well construction, civil construction. Meanwhile, 

    we hope that the parties to the Participation cap today as a starting point to further 

    strengthen the process management, improve construction methods, Tress building construction

    to be a quality engineering.

    Science and technology building construction of the main three, construction area of 6064 

    square meters, the main part of the project completed in May 2013.



     

     

    欧美日韩在线免费看,久久97超碰色中文字幕总站,日韩精品中文字幕一区,制服丝袜无码中文字幕第1页

    <legend id="c6966"><strong id="c6966"></strong></legend>
    <cite id="c6966"></cite>

      <b id="c6966"></b>